- Block
- 6
- Floor
- 10
- Rooms
- 1–2
- Longest term
- 60months
from 197 million soʻm
381 available homes
Overview
The project covers 2 hectares and consists of 6 blocks. Only 15% of the territory will be built up. The remaining 85% is given to a children's playground, parking, and mostly green space. There are 510 apartments in total. The buildings are 10 stories high, with the ground floor designated for commercial use. The buildings are constructed entirely from fired brick. Heating is provided by a boiler system. There is no gas supply. The project runs on electricity only. Solar panels on the rooftops will keep the elevators running during power outages. Handover: Q4 2027. Payment: 60-month (5-year) installment plan with no interest and no penalties. We have already delivered 5 projects on time.
Amenities
- Parking
- Playground
- Elevator
Apartments
Location
Mustaqillikning 27 yulligi ko’chasi 45 uy
UzbekistanNearby
- 1th school540 m
- Korzinka1.3 km
- Oydin dehqon bozori950 m